Thickness around the pipe
Inspection records the required total build and its distribution around the pipe, including the weld seam where applicable. Pipe identity links the readings to the released coating lot.
Holiday detection
The agreed holiday test checks coating continuity using the applicable procedure and settings. Test voltage is selected for the adopted specification and thickness.
Adhesion and system tests
Peel adhesion, impact, indentation and other required tests address different coating properties. Their methods, temperatures and acceptance criteria follow the approved inspection plan.
Coating ends and repairs
Cutback geometry, exposed steel preservation and repaired areas are checked before release. A repair retains its qualified material and acceptance record.
3LPP coating release documents