Home » Products » Steel Structures » Industrial Steel Buildings

Industrial Steel Building Manufacturer

Fabricated frames and roof or wall materials for project supply

H-section columns and rafters, C purlins and bracing form the building steel package. Choose the frame alone or add steel sheets or sandwich panels for the roof and walls, with member preparation and enclosure connections coordinated to the building drawings.

Main steel
H-section frames
Secondary steel
C purlins & bracing
Enclosure options
Steel sheet & sandwich panel
Member finishes
Painted or galvanized

What we supply for an industrial steel building

Supply components are scheduled separately in the building quotation
Package itemSupplied componentsSelection basis
Main framesH-section columns, beams and raftersMember sizes and connection details from project drawings
Secondary membersC purlins and drawing-defined wall-support membersSection dimensions, cut lengths and attachment positions
Bracing and tiesRound bars, steel tubes and angle bracesBrace locations, ends and member identification
Base and connection platesFabricated plates and attached detailsPlate geometry, hole pattern and weld detail
Roof materialsSteel sheets or sandwich panelsProfile, covering dimensions and specified panel construction
Wall materialsCorrugated steel sheets or sandwich panelsPanel layout, openings and specified panel construction
Edge and drainage itemsSteel edge covers and color-steel guttersDrawing-defined lengths and corner details

Steel frames, roof and wall materials, flashings and drainage items are priced separately. The quote also lists included bolts, anchors and panel fasteners, with any hardware supplied by others identified.

Frame layout, bay spacing and clear height

Open floor space or interior columns

A clear-span frame keeps columns outside the usable floor area. A layout with interior columns divides the roof into shorter spans but places supports within the building. The approved structural arrangement sets the member sizes; the choice starts with the space your operation needs.

Eave height is not working clearance

Rafters, bracing and suspended services can sit below the eave level. Door travel, crane movement and tall equipment use the unobstructed clear height at their actual positions. The building section ties these clearances to the frame geometry.

Find the dimensions or loads needed for your building schedule.

Project dimensions identify the building; they are not fixed catalog models
Project parameterDimension / unitWhat the drawing establishes
Building footprintWidth × length; ft or mmOverall dimensions and the structural grid are identified separately
Working heightEave height and clear height; ft or mmClear height is measured to the lowest obstruction in the working area
Frame baysColumn spacing; ft or mmBay positions align with aisles, equipment and the opening layout
Roof geometryPitch; rise/run or degreesRidge, eave and drainage arrangement follow the approved layout
OpeningsClear width × height; ft or mmDoor headroom and framing around service penetrations
Equipment loadsForces and reactions with unitsCrane, mezzanine or suspended-equipment loads at their actual locations

No matching requirement. Clear the search to restore the table.

Scroll sideways to see every column.

Site-specific wind, snow, seismic and other design criteria come from the project engineer and governing code. We use the released member and connection drawings for fabrication rather than assigning one load rating to every building.

Steel grades for frames and connection plates

The member schedule specifies each rolled section or built-up detail and its steel grade. Fabricated H members include web and flange thicknesses; base plates, stiffeners and connection plates carry their own material lines.

SSAB plate references for built-up members and connection plates; thickness limits apply
Plate gradeReference thicknessMinimum yield (ksi)Tensile strength (ksi)
ASTM A360.100–6.00 in.3658–80 range
ASTM A572 Grade 500.100–4.00 in.5065 minimum

These are material reference values, not building load capacities or shipment test results. The specified grade, product form and thickness govern material acceptance. A US W-section designation and a metric H-section designation remain separate identities in the fabrication schedule.

Roof sheets, wall panels and insulation

Single-skin steel sheets

Galvanized or prepainted steel sheets provide the profiled outer covering. Wave and trapezoidal profiles have different rib and lap geometry. The panel layout uses effective cover width to calculate coverage, with separate lengths around roof edges and wall openings.

Insulated sandwich panels

Our building range includes EPS, glassfiber, rockwool and PU-core roof panels, with sandwich-panel wall options. The specified core, total panel thickness and metal skins identify the assembly. Thermal and fire requirements apply to that exact panel system, rather than being established by the core name alone.

Published PPGI corrugated-sheet catalog scope; separate from sandwich-panel dimensions
Sheet parameterCatalog valueQuotation detail
Listed sheet thickness0.2–1.2 mmQuotation identifies the base-steel and coating thickness basis
Overall sheet width600–1,250 mmWidth of the selected finished profile
Effective cover width750–1,100 mmCoverage after the specified side lap
Cut lengthPanel scheduleOrdered piece length and piece count

Overall and effective widths are separate catalog ranges across profiles, not matched endpoints. Each quoted profile has its own overall width and cover width, with cover narrower than the sheet. Sheet thickness and panel construction are kept separate in the enclosure schedule.

Factory preparation for frame assembly

Frame joints and attached plates

Cut members, drilled connection holes and welded plates follow the released fabrication detail. End-plate orientation and bolt access matter where rafters meet columns or connect at the ridge. Each shipping piece carries the features required by that joint.

Purlin and brace connections

C purlin attachment points must align with the supporting frame. Brace ends and tie-member connections follow the approved connection arrangement, with left- and right-hand details identified where they differ. This keeps similar-looking secondary pieces distinct at assembly.

Base plates and anchor interfaces

Base-plate hole positions follow the approved anchor layout and common datum. Plate orientation, column centerline and anchor projection are coordinated with the foundation detail. A field change to a hole or welded plate requires an approved engineering disposition.

Steel packages for warehouses, workshops and production

Warehouses and distribution buildings

Column positions need to work with rack aisles, loading doors and vehicle movement. The end-wall and side-wall opening layout affects secondary framing and panel quantities. A warehouse package is therefore priced from the layout as well as the overall floor area.

Workshops with cranes or large equipment

Crane reactions, runway interfaces and equipment clearance affect the steelwork around the working bay. A crane tonnage alone does not describe the wheel loads or support locations. Those interfaces belong in the structural drawings used for the supplied frame.

Production buildings with services

Ducts, piping, cable routes and suspended equipment need coordinated supports and penetrations. Their locations determine which members receive attachment details and where panels are interrupted. The released opening and support schedule keeps these items in the fabricated package.

Member fit, welds and dispatch records

Steel base plate and welded H-column stub beside idle measuring tools on a bench

Connection dimensions

Member length, end-plate position and hole layout are checked against the piece drawing. Measurements use the defined datum and member orientation. Fit-related checks cover the parts that must meet at the field connection, not just the overall member length.

Weld acceptance

Weld type, size and inspection requirements follow the fabrication specification. The inspection plan identifies any required nondestructive examination, its coverage and acceptance criteria. The document schedule states which welding records accompany the order.

Painted or galvanized surfaces

Painted members follow the specified preparation and coating system; galvanized members follow the approved fabrication and treatment details. Required coating extent and finish checks are recorded in the inspection plan. Handling damage is checked before packing release.

Piece marks and shipment identity

A mark connects the fabricated piece to its drawing and packing-list entry. Frame position and erection-zone groups distinguish similar members. The agreed release package ties the supplied steel and enclosure quantities to their order records.

Records for the supplied building package

Drawing revisionMaterial identityInspection scopePiece and pack list

Building package prices and shipment planning

Steel and enclosure priced separately

Building prices itemize the main frame, secondary steel, plates, preparation and finish. Roof and wall materials are measured separately from steel weight, with packing and freight included in the quotation terms.

Shipping pieces and unloading limits

Long frames may use approved shipping breaks rather than travel as one assembled member. The transport plan works from packed dimensions and weights, delivery access and unloading arrangements. A transport limit is resolved through the approved connection detail before fabrication.

Packing by assembly group

Columns, rafters and secondary steel are grouped with their piece marks and packing counts. Coated members use protected support and strap contact points. Roof and wall sheets are packed separately with supported stacks and protected edges, so enclosure pieces remain identifiable at receipt.

Industrial building purchasing questions

Can I request a budget price before the drawings are complete?

Yes. A preliminary layout, intended use, building dimensions and destination are enough to start a budget quotation. Its stated scope and assumptions distinguish it from a fabrication order. Production is released against the approved member and connection drawings.

Who provides US-stamped structural and foundation design?

The project’s licensed engineer handles the design and permit documents required by the local jurisdiction. Our supply agreement covers the listed fabricated steel and enclosure materials. Foundation work, erection and site labor belong to the project’s construction scope.

Can the building be extended later?

A planned extension needs an end-wall and connection arrangement that allows the future bays to be added. The project engineer defines that arrangement and the required structural checks before the first stage is fabricated. Future expansion is therefore part of the design brief, rather than assumed from the frame type.

Can replacement members be ordered after the main shipment?

Replacement pieces are identified by the original piece mark, drawing revision and quantity. Matching the original section alone can miss a changed hole pattern or attached plate. The replacement quotation uses the complete fabrication detail for that piece.

Can crane-support steel be included in the building order?

Crane-related members are quoted from the approved equipment and structural drawings. Crane loads, runway geometry, connection details and required clearances remain part of that project-specific design.

Get a quote for your industrial building

Share your drawings and quantities, or a preliminary building layout, with the destination and the materials you want us to supply. We quote the frame, enclosure options, finish and freight separately, with the drawing basis, production schedule and shipment terms.

METDAX
Get a quote
Search METDAX

Language

Get a factory quote

Send your specifications or attach a material list.

Industrial Steel Buildings

Your information is used to respond to this inquiry. Privacy policy

ruofan1901@gmail.com